Off-site modular fabrication was chosen as the construction technique for the Casa Chiara project to minimize waste (reducing waste 50% through precision cutting and indoor storage capacity), minimize costs (reducing overall construction costs by about 5%) and significantly reducing construction timeframe (2 months of site prep and factory construction plus 2 months of “button-up work” and project completion.

The project was built a factory as 16 modules at All American Homes.

photos below are by Kate Hilberg (project manager for Urban Ventures LLC). High resolution versions of the photos below are available by emailing michelle at michellekaufmann dot com.